A 990 kW project combining photovoltaic generation with the electrical infrastructure required to connect it.
● Completed projectBulboaca, Anenii Noi district, Republic of Moldova

Green Spark project archiveRenewable energy
01 Project overview
A 990 kW project combining photovoltaic generation with the electrical infrastructure required to connect it.
The Yellow Sun Power project is located in Bulboaca, Anenii Noi district. Green Spark’s documented scope includes the execution design for the plant’s electricity supply and the external 10 / 0.8 / 0.4 kV electrical networks.
Capacity990 kW
LocationBulboaca
ClientYELLOW SUN POWER SRL
Electrical networks10 / 0.8 / 0.4 kV
02 Green Spark delivery scope
Generation and grid interface, treated as one system.
The project case demonstrates Green Spark’s capacity to coordinate the electrical layer that turns a solar field into a connectable infrastructure asset.
- 01Execution design for electricity supply
- 02External electrical networks
- 0310 / 0.8 / 0.4 kV voltage interfaces
- 04Technical coordination of connection solutions
- 05Project documentation and delivery support