FlyRen Moldova was established in 2015 to take on the challenge of the Moldovan government to reduce the country’s dependence on others for its energy. In 2018, flyRen constructed and now operates the country’s largest solar park currently in operationThe solar power plant is located on an area of about 2.5 hectares of land. (The Earth is the introduction of the company on the basis of a long-term lease) within the city of Chisinau | www.flyren.eu

Information about the park
- PV: Array
- Total panels: 3700 pcs. (0.99 MW)
- All the necessary document
- Total production per year: 1 200,000 kWh
Yield