NOTICE OF CONNECTION:
No. G20102022040003 from 14.04.2022 valid until 14.04.2024
Address: Anenii Noi district, Bulboaca village, 9210
Type of power plant for which connection is requested: Photovoltaic plant
Reliability category: III
Conditions regarding the autonomous power supply source: None
The connection point to the electrical network is: LEA-10KV, PDC-170
BUBBLE 110/10KV, Fid.10
Pilonilor 60-67 sector towards PT-639AN derivative
Nominal voltage at the connection point: 10 kV
Electric power approved by approval
(also included in the electricity supply contract as contracted electric power). 500 000 W

Information about the park
- Nb.of modules 1080
- Pnom total. 594 kw/p
- Yearly production is estimated as 884.6 kWh/Year
- Delivery date of SPS in operation August ,September 2023
- TOTAL POWER. 500 kW AC / 594 DC
Yield