‘The Yellow Sun POWER” solar park was built between 2022 and 2023. The solar power plant is located on an area of about 2 hectares. (Land owned by the company) in the village of Bulboc in Anena Noi district, 35 kilometres from Chisinau

Information about the park
- PV Array
- Modules 1833 pcs.
- Inverters 10
- Total production per year: 1,500,000 kWh
- Delivery date of SPS in operation April 2023
Technologies What We Used
The total number of photovoltaic panels is 1833 pcs. (0.99 MW) JAM72S30 540/MR
The company has all the necessary documents and certificates
For the production and sale of electricity
Тhe minimum electricity generation per year will be about
1,500,000 kWh of electricity (The company won the right to sell electricity at a green tariff
on a competitive basis for 15 years)
Yield